project status CW 47


All groups are currently working out the interim presentation.

households:
  • In the course of the week in households, the data loggers placed and the groups are to develop policies and prepare for the interim presentation .
project team:
  • The group heat capture has completed the newsletter and a calculation table for heat adjustment and will make these soon along with the VDI 3807 Part 1 and VDI 2607 Part 1 is available.
budget G:

last Saturday (20:11:10) we have our budget visited. We have made an introduction into the test with the tenant and location specified in each room. In addition, we performed flow measurements in the kitchen and the bathroom. It turned out that the flow rate between about 6 liters / min (bathroom) and about 10 liters / min (kitchen) is located.
The tenant said that she shall, after our visit, another ventilation behavior of the day than before. Including it leaves the window in the living / sleeping area not open all day.
ins discussion on possible investments were the refrigerator and the washing machine. This is planned that we will carry out current measurements.